Reference (IT)

TUTU MicrofinanceMFI Solution MigrationProject

 PROJECT PERIOD – Ongoing ( June 2023 )

Ongoing project for MFI (GBS) solution for TUTU Microfinance at June 2023. We supply and provide hardware, server network, system implementation and migration for MFI solution.

 LOCATION – YANGON

2023

Woori MicrofinanceMFI Solution MigrationProject

 PROJECT PERIOD – Onging ( June 2023 )

This project is the ongoing project for MFI (GBS) solution for Woori Microfinance that located in Mayangone Township at June 2023. We supply and provide hardware, server network, system implementation and migration for MFI solution.

 LOCATION – YANGON

2023

Café SodamCCTV System and POS InstallationProject

 PROJECT PERIOD – May 2023

This project is the CCTV system and POS System for newly coffee shop that located in near Parami Hotel. We have successfully

Installed and configured CCTV, and POS systems.

 LOCATION – YANGON

2023

Hanjin Global Logistics MyanmarQME SystemProject

 PROJECT PERIOD – May 2023 ( 1 Day)

We delivered and installed planning, cable management, CCTV camera mounting, angle adjustment and NVR recorder setup for security system.

 LOCATION – YANGON

2023

Yangon Nadia Pacific Clothing Company LimitedQME SystemProject Period – 2 Months

 PROJECT PERIOD – March ~ May 2023

Cube is installed and configured Network Device for using QME system. We installed AP and switch at Production Factory to use QME wifi. In additional, we supplied TV frame installion, too.

 LOCATION – YANGON

2023

Yangon Pan-Pacific InternationalQME SystemProject Period – 2 Months

 PROJECT PERIOD – April ~ May

Cube is installed and configured Network Device for using QME system. We installed AP and switch at Production Factory to use QME wifi.

 LOCATION – YANGON

2023

HRD KoreaNetwork InfrastructuresProject

 PROJECT PERIOD – December 2022

This project is PA system and CCTV systems for HRD Korea (Pinlon). We supplied device and configuration that system.

  LOCATION – YANGON

2022

Nonghyup Microfinance – MFI Solution and Mobile Server Implementation

Project Period – Oct 2022

We supplied hardware and implementation of mobile server for MFI Solution

2022

KK Business Group – Network Infrastructure and PABX System

Project Period – 1 month (Oct 2022)

This project is the Network Infrastructure and PABX system for KK Business Group. We are supplied hardware and installed network system and PABX system that connects external and internal callers to an internal network with switch device.

2022

TuTu Finance – CCTV System

Project Period – Oct 2022

Installation and configuration of CCTV systems within 5 days in both Min Hla and Pindaya branches for Tu Tu Finance in August and October of 2022 respectively.

2022

Posco International – Access Control System

Project Period – 3 Months (Jun 2022)

We provided devices and integrated management software with door access control system. Provided detailed scope of programming and performing programming of all devices.

2022

HRD Korea – Network Infrastructures

Project Period – Oct 2022

Implementation of Network Infrastructure for EPS Center’s Pinlon Branch within 1 week in March of 2022. CUBE has also been providing maintenance service for the 8-mile branch since October, 2022

2022