![](https://cube-group.net/wp-content/uploads/2022/11/zuelling2-edited.jpg)
Project Period – 1 Week (Oct 2021)
This project is for the IT system of Zuelling Pharma. We have successfully Installed and configured of Network, CCTV, and Access Control systems.
Project Period – 1 Week (Oct 2021)
This project is for the IT system of Zuelling Pharma. We have successfully Installed and configured of Network, CCTV, and Access Control systems.