![](https://cube-group.net/wp-content/uploads/2022/11/image-75-edited-300x187.png)
Project Period – 2 Weeks (Nov 2019)
We have supplied CCTV System for all BNK Capital branches in Myanmar. We have done installation, cabling and configuration in CCTV System.
Project Period – 2 Weeks (Nov 2019)
We have supplied CCTV System for all BNK Capital branches in Myanmar. We have done installation, cabling and configuration in CCTV System.